The analysis assumes a 8.1 MMBTU/hr8 average boiler heat load and a retrofit cost of $7,500/MMBTU/hr. Assuming the mine boiler fuel demand was 10 Mcf/hr, total installed capital costs for this abatement measure would be $635,000, which includes $382,000 for the recovery system, $122,000 for boiler retrofit, and an additional 20% in owner's
The analysis assumes a 8.1 MMBTU/hr8 average boiler heat load and a retrofit cost of $7,500/MMBTU/hr. Assuming the mine boiler fuel demand was 10 Mcf/hr, total installed capital costs for this abatement measure would be $635,000, which includes $382,000 for the recovery system, $122,000 for boiler retrofit, and an additional 20% in owner's
The analysis assumes a 8.1 MMBTU/hr8 average boiler heat load and a retrofit cost of $7,500/MMBTU/hr. Assuming the mine boiler fuel demand was 10 Mcf/hr, total installed capital costs for this abatement measure would be $635,000, which includes $382,000 for the recovery system, $122,000 for boiler retrofit, and an additional 20% in owner's